What one OEE point is worth in France
On a reference two-shift line (3,600 planned hours a year, a crew of four, 150 kW average load, starting at 60% OEE) one extra OEE point is worth €12,436 a year in France at national costs.
Labour cost per hour, manufacturing
Eurostat annual estimate 2025, manufacturing (NACE C), as published by Destatis
Industrial electricity per kWh
SDES, 2025 average for non-residential customers, excl. VAT (published 23 July 2026)
One OEE point, per line and year
89% of the value is labour time and 11% is electricity.
Position among 22 countries
Ranked by the value of one OEE point on the same reference line, converted to euro. Full table on the country benchmark table.
Run it on your own line
How France compares
Same reference line, same formula, national costs. All 22 countries are on the country benchmark table.
| Country | Labour €/h | Electricity €/kWh | One OEE point, €/year | # |
|---|---|---|---|---|
| France | 47.1 | 0.1488 | 12,436 | 7 |
| Germany | 49.5 | 0.2369 | 13,782 | 5 |
| Belgium | 51.5 | 0.1901 | 13,840 | 4 |
| Spain | 28.2 | 0.1431 | 7,924 | 14 |
| Italy | 32.8 | 0.2177 | 9,670 | 11 |
| Switzerland | 60.7 | 0.2369 | 16,433 | 1 |
| United Kingdom | 29.6 | 0.1961 | 8,733 | 12 |
| EU-27 cost base | 35.0 | 0.1920 | 9,962 | · |
What moves the number in France
Industrial electricity in France is again cheaper than the EU average (16% below it in 2025 (SDES)) so in France the value of an OEE point is almost all labour time: about nine euros in ten. 89% of the value is labour time and 11% is electricity.
A PDF in English: sensitivity tables for starting OEE, shift patterns and crew sizes, the value-added view, how France compares, a 30-day baseline plan, funding routes and every source.
Public money for a measurement project in France
Bpifrance loans and regional investment aid are the usual routes for a monitoring project in France; conditions change by region and call, so check Bpifrance and your Région before you budget.
Method and limits
- Reference line
- 3,600 planned hours a year (two eight-hour shifts on 225 days), four operators per shift, 150 kW average electrical load, 60% OEE before improvement. Change any of it in the calculator.
- Labour cost
- Eurostat annual estimate 2025, manufacturing (NACE C), as published by Destatis
- Electricity
- SDES, 2025 average for non-residential customers, excl. VAT (published 23 July 2026)
- Value-added view
- Not shown for France: no like-for-like value-added series on the Eurostat basis used for the other countries.
- What it is not
- Not a margin figure, and not everything a point is worth: maintenance, scrap and overhead effects are left out, and they usually make the real figure larger.
Questions
- How much is one OEE point worth in France?
- About €12,436 a year on a two-shift line with four operators and 150 kW load, starting from 60% OEE, at France’s national labour and electricity costs. On three shifts (6,000 planned hours) the same point is worth about €20,727.
- Why does each OEE point get worth less as OEE rises?
- Because each point is a smaller share of what the line already produces: from 60% to 61% saves 1/61 of planned time, from 80% to 81% only 1/81. At 80% OEE the same point is worth €9,365 in France.
- Should I use this number in a business case?
- Use it as the floor. It prices only released hours and electricity; if the line is sold out, value the extra output at your contribution margin instead, and add scrap and maintenance effects once you have measured them.
- All 22 countries
- OEE calculator: availability × performance × quality
- What one OEE point is worth at your own margin
- Manufacturing data profile: France
Sources
- Destatis: EU labour cost per hour worked, manufacturing (Eurostat annual estimate, 2025)
- SDES: Prix de l’électricité en France et dans l’UE en 2025 (published 23 July 2026)
- ManufacturingML: France manufacturing data profile
- ManufacturingML: Western European manufacturing 2026: the Eurostat data (extracted 22 Sep 2026)
Published by TEEPTRAK SAS, which makes production-monitoring and OEE software. The costs are public statistics; the reference line is an assumption, stated so you can change it.