What one OEE point is worth in Belgium
On a reference two-shift line (3,600 planned hours a year, a crew of four, 150 kW average load, starting at 60% OEE) one extra OEE point is worth €13,840 a year in Belgium at national costs.
Labour cost per hour, manufacturing
Eurostat lc_lci_lev, 2024, manufacturing (NACE C): 2025 not published
Industrial electricity per kWh
Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
One OEE point, per line and year
88% of the value is labour time and 12% is electricity.
Position among 22 countries
Ranked by the value of one OEE point on the same reference line, converted to euro. Full table on the country benchmark table.
Run it on your own line
How Belgium compares
Same reference line, same formula, national costs. All 22 countries are on the country benchmark table.
| Country | Labour €/h | Electricity €/kWh | One OEE point, €/year | # |
|---|---|---|---|---|
| Belgium | 51.5 | 0.1901 | 13,840 | 4 |
| Netherlands | 47.3 | 0.2192 | 13,106 | 6 |
| France | 47.1 | 0.1488 | 12,436 | 7 |
| Germany | 49.5 | 0.2369 | 13,782 | 5 |
| EU-27 cost base | 35.0 | 0.1920 | 9,962 | · |
What moves the number in Belgium
13.3% of manufacturers in Belgium named labour as a factor limiting production in 2026-Q3 (EU-27: 18.0%). Where people are the constraint, released hours are worth more than the wage bill suggests: they are capacity you cannot hire. 88% of the value is labour time and 12% is electricity.
A PDF in English: sensitivity tables for starting OEE, shift patterns and crew sizes, the value-added view, how Belgium compares, a 30-day baseline plan, funding routes and every source.
Public money for a measurement project in Belgium
Read the Belgium funding guide →
Method and limits
- Reference line
- 3,600 planned hours a year (two eight-hour shifts on 225 days), four operators per shift, 150 kW average electrical load, 60% OEE before improvement. Change any of it in the calculator.
- Labour cost
- Eurostat lc_lci_lev, 2024, manufacturing (NACE C): 2025 not published
- Electricity
- Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
- Value-added view
- National manufacturing value added per person employed, €147,800 in 2025 (Eurostat nama_10_a10 ÷ nama_10_a10_e), for eight people, × 1/60. A national average, not your margin: use the OEE ROI calculator with your own contribution margin.
- What it is not
- Not a margin figure, and not everything a point is worth: maintenance, scrap and overhead effects are left out, and they usually make the real figure larger.
Questions
- How much is one OEE point worth in Belgium?
- About €13,840 a year on a two-shift line with four operators and 150 kW load, starting from 60% OEE, at Belgium’s national labour and electricity costs. On three shifts (6,000 planned hours) the same point is worth about €23,067.
- Why does each OEE point get worth less as OEE rises?
- Because each point is a smaller share of what the line already produces: from 60% to 61% saves 1/61 of planned time, from 80% to 81% only 1/81. At 80% OEE the same point is worth €10,423 in Belgium.
- Should I use this number in a business case?
- Use it as the floor. It prices only released hours and electricity; if the line is sold out, value the extra output at your contribution margin instead, and add scrap and maintenance effects once you have measured them.
- What an OEE system really costs: the 3-year calculator
- All 22 countries
- OEE calculator: availability × performance × quality
- What one OEE point is worth at your own margin
- Manufacturing data profile: Belgium
Sources
- Eurostat lc_lci_lev: hourly labour cost, NACE C manufacturing (D1_D4_MD5), EUR
- Eurostat nrg_pc_205: non-household electricity prices, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
- Eurostat nama_10_a10 / nama_10_a10_e: manufacturing value added and employment, 2025
- ManufacturingML: Belgium manufacturing data profile
- ManufacturingML: Western European manufacturing 2026: the Eurostat data (extracted 22 Sep 2026)
Published by TEEPTRAK SAS, which makes production-monitoring and OEE software. The costs are public statistics; the reference line is an assumption, stated so you can change it.