OEE point value by country · Portugal · data extracted 22 September 2026
FactoryOptimizationAI
Country benchmark · Portugal

What one OEE point is worth in Portugal

On a reference two-shift line (3,600 planned hours a year, a crew of four, 150 kW average load, starting at 60% OEE) one extra OEE point is worth €5,207 a year in Portugal at national costs.

In shortOne OEE point frees 59 line-hours a year on the reference line. At €16.5 per labour hour and €0.1482 per kWh, that is €3,895 of labour time and €1,312 of electricity: €5,207 per point, per line, per year. If the freed capacity can be sold instead, the same point is +1.7% good output: about €6,280 of value added at Portugal’s average manufacturing productivity. Portugal is at position 19 of 22 European countries on this measure.
€16.5

Labour cost per hour, manufacturing

Eurostat lc_lci_lev, 2025, manufacturing (NACE C)

€0.1482

Industrial electricity per kWh

Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes

€5,207

One OEE point, per line and year

75% of the value is labour time and 25% is electricity.

19 / 22

Position among 22 countries

Ranked by the value of one OEE point on the same reference line, converted to euro. Full table on the country benchmark table.

Run it on your own line

Inputs
2 shifts ≈ 3,600-4,000 h; 3 shifts ≈ 6,000-7,000 h
People whose hours the line’s output pays for
Preset: Eurostat lc_lci_lev, 2025, manufacturing (NACE C)
Measured average, not nameplate
Preset: Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
The math. Hours freed = planned hours × (1 − OEE now ÷ (OEE now + gain)): the same good output needs fewer planned hours. Value = hours freed × (operators × labour cost + kW × electricity price). Labour only counts if the hours are really released: overtime, a shift, agency staff or people moved to other work.
Readout
Total per year·
Line-hours freed per year·
Labour value·
Electricity value·
Value per OEE point·

How Portugal compares

Same reference line, same formula, national costs. All 22 countries are on the country benchmark table.

CountryLabour €/hElectricity €/kWhOne OEE point, €/year#
Portugal16.50.14825,20719
Spain28.20.14317,92414
France47.10.148812,4367
EU-27 cost base35.00.19209,962·

What moves the number in Portugal

Hourly labour cost in Portugal’s manufacturing rose 13.0% between 2023 and 2025 (EU-27: +9.0%). Every year on that slope raises the value of the same OEE point by about the same proportion. 75% of the value is labour time and 25% is electricity.

Free report · PDF
Get the Portugal report

A PDF in English: sensitivity tables for starting OEE, shift patterns and crew sizes, the value-added view, how Portugal compares, a 30-day baseline plan, funding routes and every source.

One follow-up from TEEPTRAK, then nothing unless you reply. We never sell or share your details.

Public money for a measurement project in Portugal

SITCE Descarbonização e Eficiência Energética (MPR-2026-01) carries EUR 165m of FEDER money at up to 85% co-financing, but only Phase 3 is still open, to 30 December 2026, and Phase 3 is restricted to large enterprises. SICE Inovação Produtiva MPR-2026-6 closes on 30 September 2026. SIAC Digitalização is not a company route: IAPMEI is the only eligible applicant.

Read the Portugal funding guide →

Method and limits

Reference line
3,600 planned hours a year (two eight-hour shifts on 225 days), four operators per shift, 150 kW average electrical load, 60% OEE before improvement. Change any of it in the calculator.
Labour cost
Eurostat lc_lci_lev, 2025, manufacturing (NACE C)
Electricity
Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
Value-added view
National manufacturing value added per person employed, €47,100 in 2025 (Eurostat nama_10_a10 ÷ nama_10_a10_e), for eight people, × 1/60. A national average, not your margin: use the OEE ROI calculator with your own contribution margin.
What it is not
Not a margin figure, and not everything a point is worth: maintenance, scrap and overhead effects are left out, and they usually make the real figure larger.

Questions

How much is one OEE point worth in Portugal?
About €5,207 a year on a two-shift line with four operators and 150 kW load, starting from 60% OEE, at Portugal’s national labour and electricity costs. On three shifts (6,000 planned hours) the same point is worth about €8,678.
Why does each OEE point get worth less as OEE rises?
Because each point is a smaller share of what the line already produces: from 60% to 61% saves 1/61 of planned time, from 80% to 81% only 1/81. At 80% OEE the same point is worth €3,921 in Portugal.
Should I use this number in a business case?
Use it as the floor. It prices only released hours and electricity; if the line is sold out, value the extra output at your contribution margin instead, and add scrap and maintenance effects once you have measured them.

Sources

  1. Eurostat lc_lci_lev: hourly labour cost, NACE C manufacturing (D1_D4_MD5), EUR
  2. Eurostat nrg_pc_205: non-household electricity prices, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
  3. Eurostat nama_10_a10 / nama_10_a10_e: manufacturing value added and employment, 2025
  4. ManufacturingML: Portugal manufacturing data profile
  5. ManufacturingML: Western European manufacturing 2026: the Eurostat data (extracted 22 Sep 2026)

Published by TEEPTRAK SAS, which makes production-monitoring and OEE software. The costs are public statistics; the reference line is an assumption, stated so you can change it.