OEE point value by country · Ireland · data extracted 22 September 2026
FactoryOptimizationAI
Country benchmark · Ireland

What one OEE point is worth in Ireland

On a reference two-shift line (3,600 planned hours a year, a crew of four, 150 kW average load, starting at 60% OEE) one extra OEE point is worth €12,268 a year in Ireland at national costs.

In shortOne OEE point frees 59 line-hours a year on the reference line. At €42.4 per labour hour and €0.2552 per kWh, that is €10,009 of labour time and €2,259 of electricity: €12,268 per point, per line, per year. Ireland is at position 8 of 22 European countries on this measure.
€42.4

Labour cost per hour, manufacturing

Eurostat annual estimate 2025, manufacturing (NACE C), as published by Destatis

€0.2552

Industrial electricity per kWh

Eurostat, 2025-S2, band IC 500-1,999 MWh, excl. VAT and recoverable taxes (band ID not published in the release)

€12,268

One OEE point, per line and year

82% of the value is labour time and 18% is electricity.

8 / 22

Position among 22 countries

Ranked by the value of one OEE point on the same reference line, converted to euro. Full table on the country benchmark table.

Run it on your own line

Inputs
2 shifts ≈ 3,600-4,000 h; 3 shifts ≈ 6,000-7,000 h
People whose hours the line’s output pays for
Preset: Eurostat annual estimate 2025, manufacturing (NACE C), as published by Destatis
Measured average, not nameplate
Preset: Eurostat, 2025-S2, band IC 500-1,999 MWh, excl. VAT and recoverable taxes (band ID not published in the release)
The math. Hours freed = planned hours × (1 − OEE now ÷ (OEE now + gain)): the same good output needs fewer planned hours. Value = hours freed × (operators × labour cost + kW × electricity price). Labour only counts if the hours are really released: overtime, a shift, agency staff or people moved to other work.
Readout
Total per year·
Line-hours freed per year·
Labour value·
Electricity value·
Value per OEE point·

How Ireland compares

Same reference line, same formula, national costs. All 22 countries are on the country benchmark table.

CountryLabour €/hElectricity €/kWhOne OEE point, €/year#
Ireland42.40.255212,2688
United Kingdom29.60.19618,73312
France47.10.148812,4367
Netherlands47.30.219213,1066
EU-27 cost base35.00.19209,962·

What moves the number in Ireland

Ireland has the highest non-household electricity price in the EU in the second half of 2025 (Eurostat), so energy carries a larger share of an OEE point here than almost anywhere else in this comparison. 82% of the value is labour time and 18% is electricity.

Free report · PDF
Get the Ireland report

A PDF in English: sensitivity tables for starting OEE, shift patterns and crew sizes, the value-added view, how Ireland compares, a 30-day baseline plan, funding routes and every source.

One follow-up from TEEPTRAK, then nothing unless you reply. We never sell or share your details.

Public money for a measurement project in Ireland

Enterprise Ireland’s Digital Process Innovation support offers up to 50% grant funding towards the internal implementation team and external expertise for a new production method: open to start-ups, SMEs and large client companies.

Method and limits

Reference line
3,600 planned hours a year (two eight-hour shifts on 225 days), four operators per shift, 150 kW average electrical load, 60% OEE before improvement. Change any of it in the calculator.
Labour cost
Eurostat annual estimate 2025, manufacturing (NACE C), as published by Destatis
Electricity
Eurostat, 2025-S2, band IC 500-1,999 MWh, excl. VAT and recoverable taxes (band ID not published in the release)
Value-added view
Not shown for Ireland: no like-for-like value-added series on the Eurostat basis used for the other countries.
What it is not
Not a margin figure, and not everything a point is worth: maintenance, scrap and overhead effects are left out, and they usually make the real figure larger.

Questions

How much is one OEE point worth in Ireland?
About €12,268 a year on a two-shift line with four operators and 150 kW load, starting from 60% OEE, at Ireland’s national labour and electricity costs. On three shifts (6,000 planned hours) the same point is worth about €20,447.
Why does each OEE point get worth less as OEE rises?
Because each point is a smaller share of what the line already produces: from 60% to 61% saves 1/61 of planned time, from 80% to 81% only 1/81. At 80% OEE the same point is worth €9,239 in Ireland.
Should I use this number in a business case?
Use it as the floor. It prices only released hours and electricity; if the line is sold out, value the extra output at your contribution margin instead, and add scrap and maintenance effects once you have measured them.

Sources

  1. Destatis: EU labour cost per hour worked, manufacturing (Eurostat annual estimate, 2025)
  2. Eurostat news, 8 May 2026: non-household electricity prices, 2nd half 2025 (band IC 500-1,999 MWh)
  3. ManufacturingML: Ireland manufacturing data profile
  4. ManufacturingML: Western European manufacturing 2026: the Eurostat data (extracted 22 Sep 2026)

Published by TEEPTRAK SAS, which makes production-monitoring and OEE software. The costs are public statistics; the reference line is an assumption, stated so you can change it.