OEE point value by country · Finland · data extracted 22 September 2026
FactoryOptimizationAI
Country benchmark · Finland

What one OEE point is worth in Finland

On a reference two-shift line (3,600 planned hours a year, a crew of four, 150 kW average load, starting at 60% OEE) one extra OEE point is worth €11,041 a year in Finland at national costs.

In shortOne OEE point frees 59 line-hours a year on the reference line. At €43.6 per labour hour and €0.0846 per kWh, that is €10,292 of labour time and €749 of electricity: €11,041 per point, per line, per year. If the freed capacity can be sold instead, the same point is +1.7% good output: about €15,520 of value added at Finland’s average manufacturing productivity. Finland is at position 10 of 22 European countries on this measure.
€43.6

Labour cost per hour, manufacturing

Eurostat lc_lci_lev, 2025, manufacturing (NACE C)

€0.0846

Industrial electricity per kWh

Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes

€11,041

One OEE point, per line and year

93% of the value is labour time and 7% is electricity.

10 / 22

Position among 22 countries

Ranked by the value of one OEE point on the same reference line, converted to euro. Full table on the country benchmark table.

Run it on your own line

Inputs
2 shifts ≈ 3,600-4,000 h; 3 shifts ≈ 6,000-7,000 h
People whose hours the line’s output pays for
Preset: Eurostat lc_lci_lev, 2025, manufacturing (NACE C)
Measured average, not nameplate
Preset: Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
The math. Hours freed = planned hours × (1 − OEE now ÷ (OEE now + gain)): the same good output needs fewer planned hours. Value = hours freed × (operators × labour cost + kW × electricity price). Labour only counts if the hours are really released: overtime, a shift, agency staff or people moved to other work.
Readout
Total per year·
Line-hours freed per year·
Labour value·
Electricity value·
Value per OEE point·

How Finland compares

Same reference line, same formula, national costs. All 22 countries are on the country benchmark table.

CountryLabour €/hElectricity €/kWhOne OEE point, €/year#
Finland43.60.084611,04110
Sweden47.20.106512,0859
Denmark55.00.273215,4022
Germany49.50.236913,7825
EU-27 cost base35.00.19209,962·

What moves the number in Finland

Finland has the cheapest band-ID electricity in this comparison (€0.0846/kWh), so almost all of the value is labour: energy-per-part reporting is close to noise here, freed hours are not. 93% of the value is labour time and 7% is electricity.

Free report · PDF
Get the Finland report

A PDF in English: sensitivity tables for starting OEE, shift patterns and crew sizes, the value-added view, how Finland compares, a 30-day baseline plan, funding routes and every source.

One follow-up from TEEPTRAK, then nothing unless you reply. We never sell or share your details.

Public money for a measurement project in Finland

Finland's Energiatuki is continuously open, funds energy-efficiency investments of EUR 10,000 to EUR 5,000,000, and pays 20% inside an energy-efficiency agreement or 25% through an ESCO against 15% without. Denmark's Erhvervspuljen calculates the grant at DKK 1,000 per tonne of CO2 or 20 øre per kWh saved. Sweden has no live national scheme for this; Klimatklivet's next open round is 22 February to 5 March 2027.

Read the Finland funding guide →

Method and limits

Reference line
3,600 planned hours a year (two eight-hour shifts on 225 days), four operators per shift, 150 kW average electrical load, 60% OEE before improvement. Change any of it in the calculator.
Labour cost
Eurostat lc_lci_lev, 2025, manufacturing (NACE C)
Electricity
Eurostat nrg_pc_205, 2025-S2, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
Value-added view
National manufacturing value added per person employed, €116,400 in 2025 (Eurostat nama_10_a10 ÷ nama_10_a10_e), for eight people, × 1/60. A national average, not your margin: use the OEE ROI calculator with your own contribution margin.
What it is not
Not a margin figure, and not everything a point is worth: maintenance, scrap and overhead effects are left out, and they usually make the real figure larger.

Questions

How much is one OEE point worth in Finland?
About €11,041 a year on a two-shift line with four operators and 150 kW load, starting from 60% OEE, at Finland’s national labour and electricity costs. On three shifts (6,000 planned hours) the same point is worth about €18,402.
Why does each OEE point get worth less as OEE rises?
Because each point is a smaller share of what the line already produces: from 60% to 61% saves 1/61 of planned time, from 80% to 81% only 1/81. At 80% OEE the same point is worth €8,315 in Finland.
Should I use this number in a business case?
Use it as the floor. It prices only released hours and electricity; if the line is sold out, value the extra output at your contribution margin instead, and add scrap and maintenance effects once you have measured them.

Sources

  1. Eurostat lc_lci_lev: hourly labour cost, NACE C manufacturing (D1_D4_MD5), EUR
  2. Eurostat nrg_pc_205: non-household electricity prices, band ID 2,000-19,999 MWh, excl. VAT and recoverable taxes
  3. Eurostat nama_10_a10 / nama_10_a10_e: manufacturing value added and employment, 2025
  4. ManufacturingML: Finland manufacturing data profile
  5. ManufacturingML: Western European manufacturing 2026: the Eurostat data (extracted 22 Sep 2026)

Published by TEEPTRAK SAS, which makes production-monitoring and OEE software. The costs are public statistics; the reference line is an assumption, stated so you can change it.