Factory losses, priced. Free calculators · benchmark data · the math always shown · updated September 1, 2026
FactoryOptimizationAI

Home › Funding by country › Ireland

Incentives · Ireland · October 2026

Ireland: manufacturing incentives and funding for monitoring projects

Programmes a production-monitoring, OEE or energy-efficiency project can use in Ireland, with operator, what is funded, status checked in October 2026 and the official page, plus 2026–2027 trade shows and the cost figures that size the business case.

Manufacturing share
30.7
% gross value added
2024 · ec.europa.eu
Manufacturing employment
291.6
thousand persons
2024 · ec.europa.eu
Labour cost (manufacturing)
40.8
EUR per hour
2024 · ec.europa.eu
Industrial electricity price
0.224
EUR per kWh
2024-S2 · ec.europa.eu

Programmes and incentives

Status was checked on the operator's page in October 2026. Anything we could not confirm is marked unverified; treat it as a lead to check with the operator, not as an open call.

ProgrammeOperatorWhat it fundsStatusSource
Digital Transition FundEnterprise Ireland (under Ireland's National Recovery and Resilience Plan, EU-funded)Driving digital transformation of Irish enterprises, particularly SMEs; grant streams/amounts not readable on page (JS-rendered)unverified
enterprise-ireland.com
Digital Process InnovationEnterprise IrelandUp to 50% grant funding towards internal implementation team and external expertise to implement new production or delivery methods (digital technologies)open
open (listed; no deadline stated)
enterprise-ireland.com
IDA Ireland grants & supports (Business Asset Grant, Business Development Programme – Digitalisation Consultancy Grant, Lean Digitalisation Business Offer, IDA Diagnostics, Training Grant, 'Go Green' Offer, RDI supports)IDA IrelandSupports for IDA client (FDI) companies covering capital investment, talent, R&D, competitiveness and sustainability; per-grant details in brochuresopen
open (listed; no deadlines stated)
idaireland.com
How to size the project before applying. Most programmes fund sensors, software and the engineering to connect them, and most ask for a payback or energy-saving estimate. Use the downtime-cost calculator with the Ireland labour and energy defaults above, then the OEE ROI calculator; the ROI workbook turns both into the one-page business case most operators ask for.

Trade shows 2026–2027

EventCityDatesOrganiser
National Manufacturing & Supply Chain Expo 2027Dublin (RDS Simmonscourt)19–20 May 2027manufacturingevent.com
Free download

Manufacturing Incentives Tracker 2026 (45 countries)

One Excel workbook with every programme on this site: country, operator, what it funds, status in October 2026 and the official URL, plus the 2026–2027 trade-show calendar and the cost defaults by country.

  • 148 programmes across 45 countries with status and source
  • Filterable by country, operator and status
  • Trade-show calendar 2026–2027
  • Labour and electricity cost by country for the business case

One follow-up about your improvement program. No newsletter, no spam.

Done: your tracker is ready.

Download (.xlsx)

Questions

Which Ireland programmes fund OEE or production-monitoring software?

The table above lists the programmes whose official page describes digitalisation, measurement, energy-management or Industry 4.0 investments as eligible. Status is as read in October 2026; check the operator page before building a budget on it.

Why are some programmes marked unverified?

Because the operator's page could not be read when we checked, or did not state a current status. We publish the name, operator and official URL so you can confirm it; we do not guess whether a call is open.

Where do the cost figures for Ireland come from?

From official statistics (Central Statistics Office (CSO), Eurostat, the World Bank, the IFR and labour-cost series from BLS/ILOSTAT), each linked to the page it was read from. They are national averages, not your plant's numbers.

Sources

Data checked October 2026. Published by TEEPTRAK SAS, which sells production-monitoring and OEE software; programme status is reported as read and is not advice. Full country dataset: oee-benchmark.org/en/oee-benchmark/ireland/.

  1. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nama_10_a10?geo=IE&unit=PC_TOT&na_item=B1G&nace_r2=C&time=2024
  2. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nama_10_a10?geo=IE&unit=CP_MEUR&na_item=B1G&nace_r2=C&time=2024
  3. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nama_10_a10_e?geo=IE&unit=THS_PER&na_item=EMP_DC&nace_r2=C&time=2024
  4. https://api.worldbank.org/v2/country/FRA;CHE;IRL;NOR/indicator/NV.IND.MANF.ZS?format=json&date=2022:2024&per_page=50
  5. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/lc_lci_lev?geo=IE&nace_r2=C&time=2024
  6. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/nrg_pc_205?geo=IE&nrg_cons=MWH2000-19999&unit=KWH&currency=EUR&tax=X_VAT&time=2024-S2
  7. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/isoc_eb_ain2?geo=IE&time=2024&unit=PC_ENT&indic_is=E_AI_TANY&nace_r2=C
  8. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/sbs_sc_ovw?geo=IE&nace_r2=C&indic_sbs=ENT_NR&size_emp=TOTAL&time=2023
  9. https://ec.europa.eu/eurostat/api/dissemination/statistics/1.0/data/sbs_sc_ovw?geo=IE&nace_r2=C21&size_emp=TOTAL&time=2023&indic_sbs=AV_MFG_PC
  10. https://www.cso.ie/en/releasesandpublications/ep/p-naova/outputandvalueaddedbyactivity2023/keyfindings/
  11. https://www.cso.ie/en/releasesandpublications/ep/p-naova/outputandvalueaddedbyactivity2023/grossvalueaddedgva/
  12. https://www.cso.ie/en/statistics/industry/censusofindustrialproduction/
  13. https://ifr.org/news/robot-density-surges-in-europe-asia-and-americas/
  14. https://www.enterprise-ireland.com/en/supports/digital-transition-fund
  15. https://www.enterprise-ireland.com/en/supports/digital-process-innovation
  16. https://www.idaireland.com/
  17. https://www.idaireland.com/scale-with-ida/grants-supports
  18. https://www.manufacturingevent.com/

← All countries

Factory Optimization ROI Calculator
The calculator to prove value fast: payback math for downtime, quality and energy, editable for your plant.
Get the ROI Calculator →